Celebrities Feedback Rating Russian
Search

Most popular
Pochepa Oksana (Shark)Pochepa Oksana (Shark)
Volkov Boris IvanovichVolkov Boris Ivanovich
Bernardo Bertolucci (Bernardo Bertolucci)Bernardo Bertolucci (Bernardo Bertolucci)
more persons......
News
Movies
Russia Is Great
Free mp3 download
Count of persons: 23165





All persons
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

Krymenergo: Crimea has completed preparations for the launch of the energy bridge


Crimean energy has completed the construction of the infrastructure on the Peninsula for the launch of the energy bridge from the Krasnodar region, told the Russian energy Minister Alexander Novak, Deputy Director of the organization " Krymenergo ", the Chief Manager Andrey Anokhin.

"Yesterday we had completed all the preparation steps of the Crimean side to receive electric power from the power bridge. The station Kamysh-Burunskaya translated into a new scheme, " he said.

"today we are planning to talk about," said Novak.

Minister of energy of the Russian Federation, who arrived in Crimea this morning, visited a single dispatching service of " Krymenergo ", which manages the entire power system of the Crimea and talked with dispatchers.

"currently working in parallel Simferopol, Sevastopol, Reed-Burunskaya and Saki CHP, as well as 3 playgrounds mgtes (mobile gas-turbine power plant). The total load currently 418 MW, of which CHP - 148 MW, mgtes are 231 MW, wind power plants 29 MW, solar - 10 MW ", - reported Anokhin. In addition, the enterprise "Titan" produces 2 MW, which can not fully provide power for the city of Armyansk.

The chief Manager of "Krymenergo" also has told about How worked the power system on the night of 22 November, when After the bombings of power lines in Ukraine at the same time disabled all four lines, on which there was electricity to the Peninsula.

"one hundred years of the Crimean energy system it was 1st time when the system was up completely from scratch, synchronize a large number of stations and introduced a fully isolated mode," - said Anokhin.

The Crimea was entirely in the night of November 22, as a result of undermining 2 transmission poles coming from the Ukraine. Currently the power system of the Peninsula is working in stand-alone mode, used to save fan power.

After the launch of the so-called energy bridge, which will run along the bottom of the Kerch Strait, the power system of the Crimea becomes independent from Ukraine. As said before reporters Novak, the first phase of the project will be commissioned before December 20 of the current year, done everything in their power to hasten the work. In the Crimea very much hope that the first megawatts from the mainland will begin to power the grid of the Peninsula already at the beginning of next month.

Read more about news of the Crimea


More Celebrities

Celebrities news archive
18.09.2017
Links by theme::
BRIDGE Petr Petrovich

 Krymenergo: Crimea has completed preparations for the launch of the energy bridge
 -  Знаменитости  Krymenergo: Crimea has completed preparations for the launch of the energy bridge
 шоу бизнес последние эротические фотографии  эротика лучшие
RIN.ru - Russian Information Network
Useful links:
   
   
   
Copyright © RIN 2002 - * Feedback