Media: the utility broke the asphalt on razvodnom bridge in Nikolaev
The utility has set up a new asphalt on razvodnom bridge in Nikolaev, where asphalted locks, reports on Thursday (TSN) of the Ukrainian TV channel " 1 1 ".
yesterday it was claimed that the movement of vessels through the river Ingul in the Ukrainian Nikolayev was blocked due to the fact that during recovery utility workers asphalted locks between the movable and fixed parts of the Ingul drawbridge. Vehicular traffic across the bridge was also blocked.
"Tonight in Nikolaev finally ended the Saga with paved drawbridge. Almost night, the Utility broke new asphalt on some of the bridges, because after the restoration of the bridge are unable to breed, to to repair company entered military court ", - is Reported on the Internet representation TSN.
they say that the road overlay was incredibly congested, public Utilities not removed pavement removed two unnecessary ballast. Just deleted presumably 28 tons, gave more pressure on the hydraulics, and the bridge still stood. The culprits in this situation until discovered.
|